Three ways to start. No discovery phase.

Start with one governed model for AU$500 and install it yourself, or have the whole Control Room installed on your data for AU$7,500. Same architecture underneath either way, so you never outgrow where you started. All prices exclude GST.

Individual model

AU$500 each, ex GST

One governed workbook, self-installed

  • Any model from the catalogue, built on the nine-tab spine
  • How-to guide, worked example and data dictionary
  • QA sheet and testing checklist
  • 30 days of email support
  • Download after checkout
InstallSelf-serveLicenceSingle site, internal use
Choose a modelSecure checkout, GST added

Reporting profile

AU$500 each, ex GST

One report, configured to your business

  • Daily, weekly, monthly, executive or GM view
  • Your KPIs, targets and RAG thresholds set up
  • Your loss categories and owners loaded
  • Built from your Control Room answers
  • Delivered in five business days, one revision
InstallWe configure, you run itLicenceSingle site, internal use
Full install

Control Room

AU$7,500 ex GST, single site

The installed system. Target: 14 days from data access

  • GM Control Room plus every model under it that your answers call for
  • Data mapping and a Power Query refresh pipeline
  • Operating cadence: agenda, owners, follow-up
  • Two training sessions and 14 days of hypercare
  • Governance pack, changelog and signed QA
InstallTarget 14 days, 50% deposit to bookLicenceCompany-wide, single site

Credit, not sunk cost

Everything you spend on AU$500 models or profiles in the 90 days before you book a Control Room is credited in full against it.

Care plan

AU$300 / month, optional. Refresh support, light updates, one new reporting profile a quarter and a quarterly health check.

More than one site?

Quoted on the call. Extra sites and group roll-ups use the site replication model, so each extra site costs a fraction of the first.

What the two illustrative installs returned.

Illustrative ROI, on stated assumptions
Illustrative caseAnnual benefitInvestmentPayback12-month multiple
Manufacturing: downtime and pricingAU$70,000AU$7,500~1.3 months9.3×
Mining: availability and cost per tonneAU$140,000AU$7,500under 1 month18.7×

Illustrative ROI only. Both figures are conservative reads built from typical scenarios and real operating experience, stated with their assumptions. They are not a record of a named client and not a guarantee of results. Outcomes depend on your data and the actions you take.

Pricing questions.

Can I buy one model and try it?

Yes. Every model is a complete governed workbook with its own data dictionary and QA sheet, not a cut-down teaser. It is the first rung of the same architecture as the full Control Room, so nothing is rebuilt if you go further.

What happens to what I’ve already spent if I book a Control Room?

Anything spent on AU$500 models or reporting profiles in the 90 days before you book is credited in full against the AU$7,500 Control Room.

How long does a Control Room install take?

The target is 14 days from the day we have access to your data exports, followed by 14 days of hypercare. The timing is confirmed in your written proposal.

We run more than one site. How is that priced?

Quoted on the call. Extra sites and group roll-ups use the site replication model, so each extra site costs a fraction of the first.

Is there ongoing support?

An optional care plan at AU$300 a month covers refresh support, light updates, one new reporting profile a quarter and a quarterly health check.

How does this compare with OEE or production-monitoring software?

Monitoring software is usually billed per machine, per month, and often needs sensors or hardware fitted. A Lodestone Control Room runs in the Excel you already own, on the exports you already have, for a one-off AU$7,500 per site. If you later move to a monitoring system, the KPI definitions, owners and cadence carry straight across.

Do prices include GST?

No. All prices are in Australian dollars and exclude GST.

Not sure which fits?

Answer the Control Room questions. You get your control score, the dollars at stake and a suggested starting point, with a PDF to keep. If one AU$500 model is all you need, it says so.